BraWoPark Business Center II, Germany

The upper floors of the “BraWoPark Business Centers II“ in Braunschweig, where the PERI RCS climbing protection panel is used for advertising purposes on the two topmost floors.
Picture of the complete shell structure of the “BraWoPark Business Center II” in Braunschweig.
Panels and main girders, the two main components of the SKYDECK system, which are used for the slab formwork.
View from one floor of the shell structure, where the yellow PERI PROKIT side mesh barrier has been installed and where the MP landing platform from the floor above can be seen.
View of the finished shell structure of the “BraWoPark Business Center II” in Braunschweig.
A worker lets the RCS protection panel unit climb to the desired height along the climbing rails with the help of the mobile RCS climbing hydraulic system.
A worker, who positions the climbing rail and the climbing shoe on the RCS protection panel unit with a mobile hydraulic cylinder.

Project data

Location: Braunschweig, Germany

The 70 m high building of the Business Center II BraWoPark at the main station in Braunschweig in Germany puts its stamp on the complete cityscape of the city of science and research. It consists of a 5-floor base construction which is 120 m long and 15 m wide, and it offers office space of more than 13,000 m².

Requirements

Providing a customized formwork solution for the “climbing“ of the high-rise in weekly cycles

Customer

Köster GmbH, Osnabrück

Customer's benefit

  • The PERI system combination of SKYDECK slab formwork and RCS climbing protection panel, which can be operated without a crane, saved time and costs.
  • Flexible utilization without any planning effort
  • Safety at every height during shell structure work and finishings
  • Reduced shuttering times
  • Shuttering and climbing without a crane
Picture of Arwed Kähler, project manager at Köster GmbH, Osnabrück
Arwed Kähler
Project Manager

With SKYDECK and RCS, we chose the right system combination. As a result, we could – together with our construction team – reduce our own deadlines from 12 to 7 days per floor.

PERI solution

  • Adjusted formwork solution with SKYDECK panel slab formwork and RCS climbing protection panel
  • Use of side mesh barriers, posts and feet also for oval building geometries with front sides shaped like a circular arc
  • PROKIT safety systems completed PERI’s suggested construction method