Heavy athlethics stadium, Greece

Heavy athletics stadium, Athens, Greece - HD 200 heavy-duty props combined with the MULTIPROP system formed a 21.00 m high shoring tower for load transfers of 500 kN.
Heavy athletics stadium, Athens, Greece - After fixing the 72 m long steel truss, three shoring towers were lifted by crane to the next point of use in the form of a cost-effective moving unit.

Project data

Location: Athens, Greece

Heavy athletics stadium for the 2004 Olympic Summer Games with a suspended roof structure

Requirements

  • support of the enormous, 72 m long steel lattice girders
  • high loads
  • strong wind loads
  • complex contact area

Customer

J&P – AVAX SA

Customer's benefit

  • fast erection and dismantling
  • moving of whole units by crane
George Foutris, Project leader, Statement, Heavy Athletics Stadion Atehs
George Foutris
Project leader

The PERI MULTIPROP and HD 200 systems could be combined in an ideal way in order to safely transfer the high vertical loads despite the complicated geometry of the steel lattice girders. Based on the experience during this project, I can say that for me, PERI is a formwork supplier with the technical expertise and large delivery potential that can help us to master such difficult tasks.

PERI solution

  • combination of HD 200 and MULTIPROP to create a 21 m high support system for a load transfer of 500 kN