Four Seasons Hotel, Kuala Lumpur, Malaysia

When finished, the 77-storey high-rise building will have a total height of 324.50 m.
Located right next to the striking Petronas Towers is another architectural highlight in Kuala Lumpur: the Four Seasons Centre.
The RCS Climbing Protection Panel used provided a continuous, circumferential enclosure of the upper storeys under construction. An important requirement of the construction work, which demanded a high level of safety for the construction team, was thus fulfilled.
Limited crane capacity is very often the limiting factor in constructing high-rise buildings. Through the use of the mobile self-climbing devices, with which the RCS Climbing Protection Panel was lifted to the next floor without the use of a crane, meant the required crane time at the Four Seasons Hotel could be minimized.
In Kuala Lumpur, the flexible PERI UP scaffolding system made a convincing case not only through its simple assembly but also, in particular, by the optimum adaptation possibilities available in order to accommodate the range of geometries and loads. Among other things, the numerous reinforcing steel ribs could easily be modified.

Project data

Location: Kuala Lumpur, Malaysia

  • Located next to the Petronas Towers in Kuala Lumpur, the Four Seasons Place is a 342-metre high building complex.
  • The high-rise structure features the luxurious Four Seasons Hotel complete with numerous suites and apartments as well as a shopping centre.
  • Construction time: 3.5 years. Completion: 2018

Requirements

  • Development of a solution whilst taking into account only minimum availability of crane usage
  • Formwork solution for the massive reinforced concrete building core and stiffening reinforced concrete shear walls as well as reinforced concrete slabs
  • Construction of a total of 77 floors within a very tight schedule

Customer

CRCC, China Railway Construction Company, Malaysia Bhd

Customer's benefit

  • Cost-effective shoring solution due to optimal adaptation of the loads to be transferred
  • Safe working conditions in the upper floors thanks to the reliable use of the climbing protection panel
  • Fast climbing of the protection panel using mobile climbing units without a crane; saving on valuable crane time - the rotating tower crane was the limiting element of the construction site equipment and could be used in other ways
  • Reliable, best service for supporting all formwork and scaffolding processes on the construction site
Portrait of Ma Zhan Jiang, Project Manager at CRCC, China Railway Construction Company, Malaysia Bhd
Ma Zhan Jiang
Project Manager

PERI complied with our requests right from our very first meeting. The comprehensive support in planning, static and logistics through to the on-site service had a very positive impact on the project.

PERI solution

  • Planning of an economical and safe formwork and scaffolding solution
  • Provision of all required static calculations for the formwork and scaffolding
  • Flexible shoring solution for high loads and great heights
  • All-round complete enclosure of the open building edges in the upper floors with the RCS Climbing Protection Panel
  • Briefings, especially during the initial use of the formwork on the construction site, comprehensive jobsite support throughout the entire period of construction