Subway tunnel U4

Project data

Location: Hamburg, Germany

  • 710-m long subway tunnel as component of the south-eastern extension of the U4 from the subway station “HafenCity Universität” to the new stop “Elbbrücken“.
  • The route with a total of 1.3 km mostly runs below the Versmannstrasse at a depth of about 20 meters.

Requirements

  • Manufacturing of trough and tunnel in open-cut tunneling method – at a depth of up to 20 meters within a diaphragm wall excavation pit.
  • Semi-monolithic fabrication of a total of 71 tunnel segments with concreting cycles of 10 meters each – walls and slab in one pour.

Customer

Max Bögl, Ing.-Bau Hamburg

Customer's benefit

  • Adherence to the ambitious schedule through the fabrication of the tunnel segments in regular weekly cycles.
  • The loads can be transferred without ties within the formwork carriage structure, since concreting is done single-sided against the diaphragm walls.
  • The tunnel formwork adjusts itself to the changing cross-section widths and heights.
  • Cost-efficient project solution due to the possibility to rent the VARIOKIT system elements.
Norbert Klopf
Foreman

Actually I am always satisfied with PERI. The cooperation is excellent, also details are always paid attention to and taken into consideration for finding a solution.

PERI solution

  • Customized PERI tunnel formwork carriage solution, mostly based on VARIOKIT system elements.
  • Jobsite-adapted formwork concept designed with meticulous attention to detail on the basis of good cooperation.