Los Ramones II Pipeline, Mexico

Los Ramones II Pipeline, San Luis Potosi, Mexico
Due to the instruction in assembly, cleaning and storage by the PERI supervisor, the construction team worked efficiently right from the start.
DUO is a real hand-set formwork: the largest panel with 90 cm x 135 cm weighs less than 25 kg and can easily be carried by hand.
DUO Multi Panels are used to realise reinforced concrete supports. A circumferential PERI UP scaffold ensures safe working conditions.

Project data

Location: San Luis Potosi, Mexico

45 square supports of 2.00 m in height with edge lengths from 40 cm to 50 cm

Requirements

  • Reinforced concrete frame supports of a new control station for a gas pipeline
  • Quickly understood and with little training
  • Straightforward application

Customer

RUBA Arquitectos, SA de CV, Mexico

Customer's benefit

  • The use of the innovative system formwork was extremely efficient and quick right from the beginning
  • Panels can easily be carried by hand
  • Easy to mount and move manually
  • Less crane times
  • Accelerated construction progress

PERI solution

  • Utilization of the DUO Multi Panels
  • 5 sets of formwork are mounted with 4 DUO Multi Panels DMP 75 each
  • A circumferential PERI UP working scaffold with a ladder access
  • The instructions regarding the assembly, cleaning and storage were given by the PERI supervisor