Cement plant Ivano-Frankowsk, Ukraine

Cement plant Ivano-Frankowsk, Ukraine - For extending the cement plant, engineers from PERI Ukraine designed a comprehensive and sophisticated formwork and scaffolding solution.
Cement plant Ivano-Frankowsk, Ukraine - A safe climbing formwork solution on basis of the CB climbing system and an efficient shoring concept using the PERI UP scaffold system and MULTIPROP.
Cement plant Ivano-Frankowsk, Ukraine - Due to the non-availability of storage space, PERI supplied the formwork and scaffolding materials in close consultation with the site management.
Cement plant Ivano-Frankowsk, Ukraine - With help of CB 240 climbing brackets externally and CB 160 internally along with VARIO girder wall formwork, the 43 metre-high silo was formed in 4-day concreting cycles.
Cement plant Ivano-Frankowsk, Ukraine - An ideal combination and perfectly adapted: PERI UP modular scaffold and the MULTIPROP system - the two modular load-bearing systems for high loads and for use at great heights.

Project data

Location: Ivano-Frankowsk, Ukraine

43 m high silo with an inner diameter of 12 m and a 77 m high, 6-storey production facility

Requirements

  • establishment during normal plant operation

Customer

Energospezialhochbau EBCC, Kusnezowsk

Customer's benefit

  • 4-day cycle for climbing the silo tower
  • easy handling
  • job site handling during normal plant operation thanks to deliveries according to schedule
Vladimir Burchak, Construction Manager, Statement
Vladimir Burchak
Construction Manager

I am very satisfied with the comprehensive PERI formwork and scaffolding solutions, but also with the easy handling of the PERI systems that were applied. Even partly inexperienced jobsite staff can work safely and fast with it. PERI always delivered the required material on time to the jobsite, this made it possible to handle the jobsite during normal plant operation.

PERI solution

  • CB climbing scaffolding for silo tower walls in 13 concreting sections with 3.30 m standard cycle heights
  • PERI UP shoring solution for floor slabs with 10-16 m room height as well as MULTIPROP temporary support