Sie befinden sich auf der internationalen PERI Webseite. Lokale Informationen finden Sie auf der Webseite von PERI Deutschland. Alle PERI Webseiten im Überblick.
You are on PERI's international website. Click here to switch to PERI USA. Click here to view all PERI websites.
SKYTABLE is the ideal solution for the forming of large slab areas. For buildings with open facades, areas of up to 150 m² can be formed with this large-sized slab table. SKYTABLE operations are always project-specifically planned. The dimensions are in accordance with the building geometry and are only limited by the maximum dead weight of the table. With the remote-controlled lifting mechanism, SKYTABLE can be quickly and safely moved to other storeys.
Extremely quick with very large forming surfaces, easy and simple lowering with short distances
Extremely safe through a remote-controlled moving procedure of the tables from a safe position on the concreted slab
Extremely adaptable through project-specific, individual planning
Technical Details
Project-related planned slab table with areas of up to 150 m²
6.00 m to 24.40 m long and 1.80 m to 6.10 m wide with 2 trusses; 9.00 to 15.00 m long and 6.00 m to 9.00 m wide with 3 trusses
For slab thicknesses up to 40 cm
Easy moving throughout the storey by means of the Transportation Trolley and Lifting Unit STM with integrated chain hoist; transport into the next storey with remote-controlled lifting mechanism
Load transfer via MULTIPROP Props which are mounted to the truss girders by means of quick release devices; for greater heights, use with MULTIPROP shoring towers
No infill areas due to project-specific planning
Do you have a question?
We would be pleased to advise you personally or send you further information.
We are absolutely satisfied with the PERI systems and the comprehensive service which helped us with proficient engineering, logistics and jobsite support to successfully implement the project. We are able to work safely and with minimum crane utilisation with SKYTABLE and ACS – thus we need less than 4 days for one storey.
Your choices regarding cookies on this site PERI uses cookies in order to adapt the website to your needs in the best possible way. Click on "OK" to accept cookies or click on "Our Privacy Policy" to obtain a detailed description of the cookies we use. Our privacy policy