You are on PERI's international website. Click here to switch to PERI USA. Click here to view all PERI websites.

SKYDECK Panel Slab Formwork

Overview

SKYDECK means easy, effortless and thus fast, safe shuttering with a systematic assembly sequence. The clever design with drophead allows for early striking and reduces on-site material requirements. The low demand of props simplifies the transportation of formwork material across the site.

Fast
Early striking already possible after one day, depending on slab thickness and concrete strength.

Lightweight
All parts are made from aluminium; panels and main beams weigh less than 16 kg

Efficient
With systematic assembly and only a few slab props


Technical Details

  • panel slab formwork with slab thicknesses of up to 42 cm in standard operation as well as up to 109 cm with 150 cm main beams and panel width 75 cm
  • lightweight and easy to handle individual components
  • systematic assembly sequence and safety
  • low number of props required in the standard area with only 0.29 props per m² (with 225 cm main beam)
  • early striking with drophead system
  • easy to clean due to powder-coated main beams, self-draining edges on panels and main beams
  • accessories for fast length and width compensation and filling of remaining areas as well as the shuttering of columns
  • high safety at slab edge with cantilevered slab beams and platform
  • easy change of direction of the panels

Do you have a question?

We would be pleased to advise you personally or send you further information.

Contact us

Regional Availability

SKYDECK Panel Slab Formwork is available in the following countries:

Jürgen Pischof, Site Manager
Jürgen Pischof
Site Manager

With SKYDECK, we have exactly the right slab formwork system for our construction project – the drophead for early striking as well as the simple and easy handling have really convinced us. And the MAXIMO wall formwork is 25 per cent faster than conventional panel formwork systems; the one-sided anchoring in particular saves a great deal of time.

Project report
Timothy Rowbottom, Contract Manager: Aveng Grinaker-LTA, Johannesburg, South Africa
Timothy Rowbottom
Contract Manager

SKYDECK effectively addresses the issues of time, quality and cost. It is extremely versatile and can be adapted to any decking issue.

Project report