Skyscrapers

University Club Tower, Milwaukee, Wisconsin PERI‘s ACS (Automatic Climbing System) was chosen for this project because Findorff wanted to run the shear walls ahead of the horizontal slabs.
The Regatta, Chicago, Illinois, USA For the construction of the reinforced concrete core, the ACS self-climbing system accelerated working operations as shuttering, striking and climbing could be carried out without requiring a crane.
Number One Dubai Marina, Dubai, United Arab Emirates Currently, there is no other place where so many spectacular buildings are being developed as in Dubai.
C3 Tower – Jumeirah Lake Towers, Dubai, UAE The 34-storey office, retail and residential complex, designed by reputed architects DAR Consultants, features one, two and three bedroom apartments and penthouses.
Hilton Plaza, Warsaw, Poland For construction of the structurally braced reinforced concrete core as well as internal and external walls, the variable VARIO GT 24 girder wall formwork mounted on KGF 240 climbing scaffold was used. In the outer areas, however, the climbing ...