PERI Systems In Use

MULTIPROP Slab prop

Proyecto PERI: Estadios de Fútbol para el Mundial Sudáfrica 2010 (Pic 1)

Soccer stadiums for the 2010 World Cup, South Africa

Beginning on 11 June, nine South African cities will be the venues for the 2010 FIFA World Cup – on 11 July after 64 matches, the new world champion will be crowned. However, German-South African participation has already taken place in the ...

Absolute World, Mississauga, Canada

Two spectacular high-rise buildings are currently twisting and turning upwards into the Canadian sky. During the construction of the extremely complicated building geometry, the PERI RCS climbing protection panel is ensuring rapid building ...
PERI Project: The King Abdullah Financial District, Riyadh, Saudi Arabia (Pic01)

The King Abdullah Financial District, Riyadh, Saudi Arabia

In a construction period of only three years, a gigantic new district will have been created in Riyadh, the new financial centre of the Kingdom of Saudi Arabia. Currently, a total of five reinforced concrete cores are being constructed with ...
PERI Project: Airport Berlin Brandenburg International BBI, Berlin, Germany (Pic 02)

BBI Airport, Berlin-Schönefeld, Germany

For completing the terminal structural work of the new airport in Berlin the engineering specialists from several PERI branch offices planned the efficient formwork and scaffolding solutions in close co-operation with the contractor.
PERI Project: Airrail Center, Frankfurt on the Main (Pic 1)

Airrail Center, Frankfurt am Main, Germany

The unique architecture of the Airrail Center, and the fact that the roof of existing building forms the basis for nine new storeys, requires a complex formwork and scaffolding solution. In particular, for the transfer of loads during construction ...