Underground Station, Móricz Zsigmond Platz, Budapest, Hungary
7.3 km long is the first section of the M4, the new fourth line of the Budapester Metro. It passes through under the Danube and features a fully automatic, driverless operation - at 90-second intervals, up to speeds of 80 km/h.
New Shires Shopping Centre, Leicester
Byrne Bros. chose to use they’re existing stock of VARIO girder wall formwork alongside PERI CB 240 climbing scaffold on 11 of the projects 15 cores. The TRIO panels on the remaining four cores were hired additionally in order to make a comparison ...
Longannet Coal-fired Power Station, Kincardine
A consortium of Alstom and Amec Industrial have been commissioned to install a Sea Water FGD plant as part of a major capital improvement programme by Scottish Power that will secure the future of Longannet Power Station – the second largest ...
Harry Rosen Expansion Project, Toronto, Ontario
PERI designed, supplied and installed MULTIPROPs and GT 24 girders in combination with PERI UP scaffolding components to provide a safe pedestrian walkway for the 2 story expansion of the well known prestigious Harry Rosen Clothiers in Toronto.
European Patent Office, Munich, Germany
Located in the Munich city centre, the European Patent Office was extended through the addition of two building complexes. The two buildings were constructed in an offset position to each other over a length of nearly 200 m and featured modern ...