PERI Systems In Use

QUATTRO Column formwork

South Quay Development, Swansea

The Swansea Waterfront development will see the conception of over 2,000 new apartments and houses in addition to commercial, retail and leisure facilities.
Mercedes-Benz Center in Milan, Italy

Mercedes-Benz Center in Milan, Italy

In spite of the extremely short construction schedule, high quality of workmanship as well as all safety requirements can be achieved efficiently and cost-effectively with the comprehensive PERI formwork and scaffolding solution.
SKYDECK, TRIO and QUATTRO

Edmund Burke School, Washington DC

Waddell Construction is working with PERI to construct an addition to the Edmund Burke School to accomodate a growing number of students.
Incorporating PERI’s know-how on this project enabled James McHugh to keep schedule a priority. The main placing boom located in the middle of the floor was designed to be carried by the Automatic Climbing System, eliminating the extra crane time needed to move the system separately.

The Regatta, Chicago, Illinois, USA

For the construction of the reinforced concrete core, the ACS self-climbing system accelerated working operations as shuttering, striking and climbing could be carried out without requiring a crane.
Increase in safety and reduction in costs

Power plant re-development in Mannheim with PERI platform system

The safety of workers on building sites is of paramount importance for all those responsible for site operations.