PERI Systems In Use

SB Brace Frame

PERI Project: Sportarena Lora, Split, Croatia, Photo 1

Sportarena Lora, Split, Croatia

The PERI solution functioned in equal measure as shoring and as an assembly platform, and allowed site personnel to work very efficiently. Consequently, the pairs of trusses – which were delivered to the site in segments and then pre-fabricated ...
Kops II pumped-storage hydro-power station, Partenen/Montafon, Austria

Kops II pumped-storage hydro-power station, Partenen/Montafon, Austria

The Weissenhorn-based formwork and scaffolding specialist, PERI, provided a comprehensive concept for cost-effective erection of the massive reinforced concrete walls and slabs required for this very unusual construction site.
The contractor applied a wooden liner on the face of the TRIO panels in order to comply with the architectural requirements.

Montmorency Subway Station, Laval, Quebec

PERI offered the TRIO wall formwork system - with SB Frames for the bottom one-sided walls
For the 1,083 m long Trmice motorway bridge, near Aussig in the Czech Republic, 59 piers were cost-effectively formed using PERI formwork. (Photo: PERI GmbH)

Trmice Motorway Bridge near Aussig in the Czech Republic

Currently, the D 8 motorway on the Czech side and the A 17 German autobahn are being developed to form a very important arterial road, the new E55 European highway between Dresden and Prague.

Number One Dubai Marina, Dubai, United Arab Emirates

Currently, there is no other place where so many spectacular buildings are being developed as in Dubai.