The PERI solution functioned in equal measure as shoring and as an assembly platform, and allowed site personnel to work very efficiently. Consequently, the pairs of trusses – which were delivered to the site in segments and then pre-fabricated ...
Kops II pumped-storage hydro-power station, Partenen/Montafon, Austria
The Weissenhorn-based formwork and scaffolding specialist, PERI, provided a comprehensive concept for cost-effective erection of the massive reinforced concrete walls and slabs required for this very unusual construction site.
Montmorency Subway Station, Laval, Quebec
PERI offered the TRIO wall formwork system - with SB Frames for the bottom one-sided walls
Trmice Motorway Bridge near Aussig in the Czech Republic
Currently, the D 8 motorway on the Czech side and the A 17 German autobahn are being developed to form a very important arterial road, the new E55 European highway between Dresden and Prague.
Number One Dubai Marina, Dubai, United Arab Emirates
Currently, there is no other place where so many spectacular buildings are being developed as in Dubai.