Water Retaining Structures

Budds Farm WTW, Havant PERI‘s core product, the TRIO wall formwork panel system is currently being used to construct a new 9 m high aeration tank for the extension of an existing wastewater treatment facility at Budds Farm in Havant, Hampshire.
Sandelermöns Waterworks, Jever, Germany The PERI RUNDFLEX Plus circular formwork, together with TRIO panel formwork and PERI UP reinforcement scaffolding units, provided the most cost-effective solution for the construction team.
Rusca Dam, Teregova, Romania The Rusca Dam in the Banater Mountains has an overall height of 75 m and the river Raul Alb river forms a reservoir at this point which contains a seasonal-related volume of up to an impressive 35 million m³ of water when full.
Muldenberg Dam, Vogtland, Plauen, Germany The foundation beam at the base of the dam could be formed and concreted with horizontally-positioned TRIO wall formwork elements. Single-face forming of the concrete shell was carried out with VARIO customized elements on SKSF 240 climbing brackets.
Wastewater Treatment Plant, As Samra, Jordan For around sixty individual structures, formwork and scaffolding specialist, PERI, provided the most economical solutions. Among other things, eight circular aeration tanks as well as eight final settling basins, with diameters of 65 and 54 ...
 Page:  2