Floor slabs could be easily and quick formed with the SKYDECK panel slab formwork. The drophead system alowed early striking to take place with only PEP props remaining in position as temporary support.
For both multi-storey buildings, the PERI ACS self-climbing formwork together with the RCS climbing protection panel offers maximum safety and efficient operational sequences.
Resform Construction is using PERI forms exclusively on this concrete project. TRIO panels are used for both walls and columns throughout the building.
Madison Concrete Construction chose the ACS (Automatic Climbing System) for the massive 48 ft by 120 ft (14.60 m by 36.60 m) concrete core being built ahead of the surrounding steel structure.