Water Retaining Structures

Bearspaw Wastewater Pre-Treatment Facility, Calgary, Alberta PERI worked with PCL on supplying the ideal amount of TRIO for this 22 month, $300 million concrete pre-treatment facility.
Hirschhorn Navigation Lock, Heidelberg, Germany PERI engineers developed an unusual but efficient formwork solution for the repair of the Hirschhorn navigation lock on the Neckar river.
Dinnington Sewage Treatment Works, Nottinghamshire Reinforced Structures Proprietor, Dave Johnson, chose to have the RUNDFLEX circular wall formwork for the 19m diameter Final Settlement Tanks pre-fabricated by skilled craftsmen at the PERI fabrication workshop in Rugby.
Nile River Barrage, Naga Hammadi, Egypt The new Naga Hammadi barrage is one of three dam projects which are currently being developed on the Nile River with the aim of improving the water and electricity supply to the Upper Egypt region.
Walnut Creek Dam, Austin, Texas For this project, PERI offered the TRIO modular wall formwork system. Using only one type of connection device, called the BFD, multiple configurations of various panel sizes could be easily connected together.
 Page:  3