Erosion at an advanced stage on Mount Benacantil and the associated risk of falling rocks meant that extensive stabilization measures were required. For this, PERI planned and supplied a scaffold solution complete with working platforms which ...
A crew consisting of approximately 50 men, worked around the clock setting up over 1,212,542 lbs (552,000 kg) of PERI UP scaffolding to keep up with the demand of over 15 sub trades at this site.
For the various assembly phases, a 16.50 metre high working and support level could be erected using the PERI UP modular scaffold system which means all task assignments can be carried out very cost-effectively.
For the Imperial Wharf complex in the south-west of London, following the construction of the concrete frame with TRIO for the walls and SKYDECK for the slabs, finishing work was also to be carried out.