PERI GmbH - Montreal Subway Tunnel (Phase S-04), Montreal, Quebec PERI GmbH - Montreal Subway Tunnel (Phase S-04), Montreal, Quebec PERI GmbH - Montreal Subway Tunnel (Phase S-04), Montreal, Quebec More Images  

Montreal Subway Tunnel (Phase S-04), Montreal, Quebec




PERI''s Wide Range of Versatile Equipment Delivers The Best Formwork Solution at Montreal''s new Subway Line Project

For the expansion of Montreal''s subway grid, PERI´s engineers designed a system which allowed the contractor to maneuver the formwork through the confined underground space of the tunnel using mostly standard components.

PERI Systems In Use
  • GRV Circular Wall Formwork
  • MULTIPROP Slab prop
  • Luc Vachon, Superintendent:
    “Using PERI’s formwork on such a confined site, demonstrated the flexibility of the system to maneuver inside the right angled tunnels both very easily and quickly.”
    Contractor: NEILSON Excavation Inc., Quebec City
    Field Support: PERI Montreal
    Field Service: PERI Formwork Systems, Inc., Kanada
    PERI scope 01/2005
     
    Google +
    LinkedIn
    Twitter