Crystal Pavilions at Marina Bay Sands


Innovative solutions for a technically challenging project



At the Marina Bay, two attractive stand-alone glass-and-steel structures known as Crystal Pavilions appear to float on the water.

The design and installation of system formwork for the construction of the Crystal Pavilions had been technically challenging, as their walls have inclined areas in both directions which lead to arrises and valleys at 70° and 75°.

It was thus not surprising that the Project Manager for Wai Fong Construction Pte. Ltd., Chia Che Hieng said: ”The design of the walls are tilted at 70°, this type of project would be difficult to construct using conventional formwork.”

In spite of the difficulties, PERI was able to provide good and fast solutions through the use of its VARIO GT 24 Wall Formwork System and ST 100 Stacking Towers.

Construction of the Crystal Pavilions started in December 2009 and was completed in 2010.

The northern Crystal Pavilion will be housing a boutique concept store by Louis Vuitton. Whereas, the southern Crystal Pavilion will have two renowned nightclubs - Pangaea and Avalon to be opened in the near future.

PERI Systems In Use
  • VARIO GT 24 Girder Wall Formwork
  • ST 100 Stacking Tower

  • Chia Che Hieng


    Project Manager, Wai Fong Construction Pte Ltd

    "PERI has provided us with a solution and competent service, for a technically challenging project."

    Main contractor: McConnell Dowell South East Asia Pte Ltd
    Sub contractor: Wai Fong Construction Pte Ltd
    PERI Sales Engineer: Wong Yong Rney, HP 9794 8721
    PERI Formwork Instructors: Wong Quek Soon & Baskar Sannasy
    Field Service: PERI ASIA Pte. Ltd., Singapur
     