PERI GmbH - King Khaled Hospital Extension, Riyadh, Saudi Arabia PERI GmbH - King Khaled Hospital Extension, Riyadh, Saudi Arabia

King Khaled Hospital Extension, Riyadh, Saudi Arabia


Comprehensive PERI solution to achieve a quality end product



4.20 m high VARIO GT 24 was used for the core and retaining walls, single sided in combination with SB-B brace frames. 21 sets LICO column formwork helped to pour 60 cm x 60 cm up to 130 cm x 130 cm columns.

11,000 m² PERI TK Head Tables with VT 20 for double primary and secondary beams are supported by PEP 30-400 props, in combination with PEP 20-400 for repropping. The floor to floor height is 4.40 m.

PERI Systems In Use
  • LICO Lightweight Column Formwork
  • PEP and PEP Ergo Props
  • VARIO GT 24 Column formwork

  • Tony Svensson


    Civil Superintendent

    PERI formwork is a top quality product. We choose it because it is flexible, easy and fast to assemble and dismantle in a fast work sequence to achieve the quality end product that we are always striving for. Competitive prices, timely deliveries, good support from the PERI team for shop drawings and other technical support makes the package complete.

    Contractor: ABV Rock Group Ltd., Riyadh
    Field Service: PERI Saudi Arabia, Saudi-Arabien
    PERI scope 1 | 2010 Middle East
     
    Google +
    LinkedIn
    Twitter