PERI GmbH - Patina – YMCA, Vancouver, British Columbia

Patina – YMCA, Vancouver, British Columbia


4 day cycle achieved using ACS in landmark 43 storey high condominium



Patina located in downtown Vancouver, British Columbia, is a landmark 43 storey high, 818 m2 per level residence with 256 suites. To meet the 4 day pour cycle requirement of the jobsite, ACS self climbing formwork system was chosen to form the 9.60 m by 9.90 m core. The ACS P is a self-climbing formwork system with integrated working platform. The patented PERI hydraulic climbing mechanism raises the ACS unit to the next pour without the need of a crane. On the single sided parking level walls TRIO panels with SB brace frames and on the double sided walls MAXIMO panel wall formwork system was used.

PERI Systems In Use
  • MAXIMO Panel Wall Formwork
  • ACS P Self Climbing System
  • VARIO GT 24 Girder Wall Formwork
  • TRIO
  • SB Brace Frame

  • John Hansen


    Formwork Superintendent

    “We chose ACS for this project to achieve a 4 day cycle and save crane time. The MAXIMO wall form was much faster than conventional wood gang form panels.”

    Contractor: Bosa Construction, Burnaby, BC