Islington Wharf Development, Manchester


The RCS system:
Perfect for mid-rise construction



RCS C is PERI’s rail climbed platform system for core construction and constructors are beginning to see the benefits of a climbing system that offers crane-free ascent at reasonable expense. Perfect for the medium-rise building projects that are currently so abundant in the UK, the RCS system affords versatility without compromising on safety. In fact, being rail-guided, it is one of the safest climbing systems on the market.

The Islington Wharf residential development in Manchester is one of the latest sites to enjoy these benefits. Despite the ambitious plan of the building’s core, PERI designers delivered a successful scheme of RCS platforms and internal platform beams to support TRIO panel wall formwork.

Utilising the TSE “quick-strike” shaft element for the interiors of the two lift shafts and stairwell, sub-contractor Expanded Structures Ltd were able to achieve a turnaround rate of one floor per week.

After 18 storeys have been formed, Expanded intend to offset the core by 5 m and then continue for two further floors with the TRIO panels. When the 52-week contract is finished, this landmark tower will provide 200 residential units together with leisure and retail amenities for its residents.

PERI Systems In Use
  • TRIO

  • Ian Cripps


    Project Engineer

    “We were very pleased with the efficiency of the system. In terms of climbing systems, PERI offers some of the best products on the market.”

    Contractor: Expanded Structures Ltd, Dartford