A crew consisting of approximately 50 men, worked around the clock setting up over 1,212,542 lbs (552,000 kg) of PERI UP scaffolding to keep up with the demand of over 15 sub trades at this site.
For the various assembly phases, a 16.50 metre high working and support level could be erected using the PERI UP modular scaffold system which means all task assignments can be carried out very cost-effectively.
For the Imperial Wharf complex in the south-west of London, following the construction of the concrete frame with TRIO for the walls and SKYDECK for the slabs, finishing work was also to be carried out.
This year, the two tallest Christmas trees in Europe can be admired in Lisbon and Warsaw. With an overall height of 72 metres they are as high as a 20-storey highrise building.
The painting of the elevated water tower in Barrie was a challenge for the contractor due to the fact that a large automobile dealership was directly below.