The Waldschloesschen Bridge spans the Elbe River with a shallow, elegant arch. PERI has planned and is supplying the formwork for the superstructure of the steel composite bridge, and won over the construction site team with an easy-to-use ...
For the 2.2 km long Danube bridge, Serbian and German PERI engineers, together with the Alpine project team, developed a customised formwork solution using the VARIOKIT parapet carriage. With four parallel operating units six casting segments, ...
The motorway bridge across the Rio Sordo is in the form of a 412 m long, five-section structure with two separate superstructures. The almost 20 m wide and 3.60 m high prestressed concrete hollow box girders are being realised using two different ...
For concrete forming of the 22.75 m wide and 73.00 m long bridge deck, Jacob Brothers is using a formwork consisting of GT 24 formwork girders, SRU steel walers and SLS heavyduty spindles.