For the massive structure, PERI created a project-specific customized solution. Climbing formwork, PERI UP shoring and reinforcement scaffolding as well as VARIOKIT heavy-duty shoring towers are used. Safe access to each workplace completes ...
The new 660 MW block is an important component of the extensive modernization measures for the Ledvice lignite-fired coal power plant. For construction of the massive structural elements in connection with the transfer of loads at great heights, ...
The Belchatow facility is the largest lignite-fired power station in Europe. For the new development of the 830 MW block PERI is supplying a falsework combination consisting of ST 100 stacking towers and the flexible MULTIPROP system.
For the construction of a power station in the northwest of Spain, 58,000 m³ of PERI UP modular scaffold was used to assemble around 27,000 m² of working and access platforms.