|
Construction site of the month Bridge over the Oka, Murom Russia |
The cable-stayed bridge features two 231-metre spans and is carried by three pylons with heights of around 90 metres. Cross-sectional forms and dimensions of the pylon legs constantly change over the total height. The PERI climbing formwork solution is based on the CB climbing scaffold system, SKS single-sided, retractable climbing formwork and the VARIO GT 24 girder wall formwork system - and a comprehensive range of services.



