deutsch
 
 

Panama Canal

Videos

Pictures

1  /9
 
 

Customer's benefit

  • reduction of tie positions and, as a result, greater cost-effectiveness of the SCS climbing systems during single-face applications
  • simple handling und carrying of high loads
  • flexible adaptability to the structural geometry, which means that the working platforms are able to incline to a 15° and 30° angle as a result of the horizontal position of the platforms

Project data

Location: Panama City, Panama

Two lock facilities (Gatun/Atlantic and Miraflores/Pacific) with three lock chambers created one after the other, each of which are 403 m long and 55 m wide; Lengths of the lock facilities: 1.8 km each for a total height difference of 26 m

 

Requirements

 

Customer

Grupo Unidos Por el Canal, SA (GUPC) Joint Venture:
Sacyr Vallehermoso, Spain; Impregilo, Italy; Jan De Nul, Belgium; Constructora Urbana, Panama

 
José Pelaez | Rafael Sarmiento
Site Manager Gatun/ Atlantic | Site Manager Miraflores/ Pacific

„With PERI we have found the right partner for our Panama Canal project. The PERI team developed a detailed technical solution for every lock component and provided superb support for our GUPC jobsite team.“

„We have put our trust in PERI products for 95% of this project. PERI haven´t disappointed us. They have worked with tremendous dedication and provided us with good solutions and services for unproblematic work.“

PERI solution

 
Follow PERI online Twitter Google+ YouTube LinkedIn Xing PERI press releases
 

PERI GmbH

Formwork Scaffolding Engineering